The Ode Street Tribune: Rosslyn local news from a Rosslyn resident to everyone, worldwide
Showing posts with label
repair
.
Show all posts
Showing posts with label
repair
.
Show all posts
Wednesday, October 1, 2008
canopy repair completed
Repair of the canopy between Westmoreland Terrace Condo buildings 1307 and 1309 was completed last Wednesday. It looks great. Enjoy the view, especially since it cost us
about $70,000 to fix
.
Saturday, August 16, 2008
re-paving Rt. 50 reaches Rosslyn
Crews, working at night, have pushed four new lanes of pavement on Rt. 50 to the western edge of Rosslyn. Two more lanes and about a half-mile to go.
Update: Tacitly acknowledging the superiority of Rosslyn asphalt, re-paving stopped at the edge of Rosslyn.
Older Posts
Home
Subscribe to:
Posts (Atom)